SCOPE / GENERAL
Start with the opening, surface, and site conditions
The cutting method should follow the project, not a guess made from a search term. Give the provider enough information to decide what must be verified on site.
Y 08
Describe the result
State whether you need an opening, removal line, trench boundary, joint, or another result. Add a plan reference or rough dimensions when available.
Y 16
Identify the surface
Record whether the work involves a slab, wall, curb, masonry, or an unknown assembly. Do not assume thickness, reinforcement, or concealed utilities.
Y 24
Explain the work area
Interior occupancy, exterior access, stairs, below-grade areas, water control, debris handling, and schedule limits can shape the provider's plan.
Request a callback